Description
Sundt Construction faced a difficult site work package that included landfill remediation. During the project pursuit, Sundt defined a new process to generate volumetric comparisons from UAS-captured data; align with the project coordinate system; and produce an engineered report. This reduced the risk of over excavation, enabled everyone on the team to see how earthwork progressed, and captured construction progress in a meaningful way. Calculating quantities in Civil 3D software produced accurate quantities and an intuitive visual, and enabled the flexibility required to track 6 different quantity types. This class will discuss the process used to bring new value through these construction technologies and demonstrate the process of generating the data.
Key Learnings
- Discover Civil 3D software’s ability to generate cut/fill reports
- Discover principles of drone flights for generating topographic maps
- Discover the value of engineered data from sUAS (drone) flights
- Discover project types that benefit from frequent earthwork tracking reports