AU Class
AU Class
class - AU

Drive Your Inspection Test Plan (ITP) Completion with BIM 360 Field

Share this class
Search for keywords in videos, presentation slides and handouts:

    Description

    MWH are a global engineering and construction management company who build some of the world’s largest wastewater treatment plants. MWH in conjunction with Autodesk Consulting have implemented an innovative method to embed the construction Inspection Test Plan (ITP) inside BIM 360 Field. This method makes ITP completion intuitive for the site manager and enables the off-site quality management team and project manager to monitor its progress. Zoe Robertson from MWH and Anthony Neal from Autodesk Consulting will demonstrate how an ITP that has been documented in MS Excel can be generated into Autodesk BIM 360 Field clearly showing the building elements that require inspection and what quality inspections need to be conducted. We will also demonstrate how the ITP process can be further streamlined by embedding it in the BIM model during design. We will also discuss the people aspects that need to be understood and considered when driving QA/QC completion on-site.

    Key Learnings

    • Improve quality inspection completion rate by embedding the ITP in BIM360 Field.
    • Monitor the projects ITP completion to drive its completion.
    • Setup and configure BIM360 Field and Glue to embed the ITP
    • Understand what drives people to complete their QA/QC.

    Downloads

    Tags

    Product
    BIM 360
    Industries
    Finishing contractors
    General contractors
    MEP contractors
    Structural contractors
    Architecture
    MEP engineering
    Structural engineering
    Civil / Site development contractors
    Topics
    Building Owner
    Construction Management
    Building Information Modeling (BIM)
    Design
    CAD Management & IT
    Virtual Design & Construction
    People who like this class also liked
    BIM Inside Out: Supporting the Owner's Vision for Smarter Project Outcomes and FM
    Industry Talk

    BIM Inside Out: Supporting the Owner's Vision for Smarter Project Outcomes and FM

    A Client's Approach to BIM on a Mutli-Form, Multi-Stage Integrated Resort Development
    Industry Talk

    A Client's Approach to BIM on a Mutli-Form, Multi-Stage Integrated Resort Development

    Lifecycle BIM: Integrating Navisworks, Revit, BIM 360 Field, and BIM 360 Glue, and FM Software
    Industry Talk

    Lifecycle BIM: Integrating Navisworks, Revit, BIM 360 Field, and BIM 360 Glue, and FM Software

    Practical Use of Immersive BIM for Design and Construction
    Industry Talk

    Practical Use of Immersive BIM for Design and Construction

    Being Glued to the Blue—BIM 360 Glue Workflows for Blue Ciel Condos
    Instructional Demo

    Being Glued to the Blue—BIM 360 Glue Workflows for Blue Ciel Condos

    Mitigating Construction Risks with BIM and Robotic Total Stations
    Industry Talk

    Mitigating Construction Risks with BIM and Robotic Total Stations