Description
Many may think that one should separate Navisworks software and BIM 360 Model Coordination on a project by choosing one or the other for clash modeling. This could not be further from the truth. This class will highlight case studies of recent Tetra Tech projects that have resulted in a greater than 50% drop in average time spent at the end of projects for disciplines resolving clashes by using BIM 360 Model Coordination and Navisworks. Attendees will learn how to easily start working within BIM 360 Model Coordination, which will enable an earlier start to clash coordination in the project’s design cycle before running a more comprehensive clash analysis using Navisworks. This class will also provide tips, tricks, and innovative processes for working on projects in BIM 360 to easily set up the BIM 360 Model Coordination service, and we’ll cover the new features added in 2021 for bringing these results into Navisworks.
Key Learnings
- Discover the benefits of using both Navisworks and BIM 360 Model Coordination on a project.
- Learn how to collaborate clash modeling between BIM 360 Model Coordination and Navisworks.
- Discover the strengths of BIM 360 Model Coordination and Navisworks in the clash detection process.
- Learn how to start a project in BIM 360 Model Coordination in under 10 minutes.