Description
In 2021, Greenheck embarked on a journey to replace SAP PLM corporately for all 200 designers. The multi-year project involved standing up Vault servers with replication, building an interface from Vault to SAP using coolOrange, and migrating hundreds of thousands of CAD files from SAP PLM to Vault. Vault and SAP are now in sync as engineering data flows seamlessly between the two systems.
Key Learnings
- Learn about the size and scope of switching PDM/PLM systems.
- Learn how Vault can be integrated with ERP systems.
- Learn about the steps required to implement a large Vault infrastructure.
- Learn about the complexities involved in a data migration from another PLM system to Vault.