AU Class
AU Class
class - AU

Solving the Clash Between Model Coordination and Navisworks

Share this class
Search for keywords in videos, presentation slides and handouts:

    Description

    Currently, Autodesk offers two 3D coordination and clash detection tools in its Architecture, Engineering & Construction Collection. Deciding between Model Coordination and Navisworks software can be a challenge. Have you wondered how large multinationals like AECOM are making that decision? In this industry talk, AECOM will share some of our ideas and workflows on how best to use Model Coordination and Navisworks on your vertical infrastructure projects.

    Key Learnings

    • Learn about the factors driving the decision of when to use Model Coordination and/or Navisworks.
    • Learn how to share models in accordance with ISO 19650 status codes and workflows.
    • Hear about real-world use cases for strategies of grouping, prioritization, and dealing with clash false positives.
    • Learn about building optimized dashboards to make your clash detection more productive for the project team.

    Tags

    Product
    BIM Collaborate Pro
    Industries
    Architecture
    Topics
    CAD Management & IT
    Virtual Design & Construction
    People who like this class also liked
    Model Coordination Strategies for Large-Scale Water Treatment Plant Projects
    Industry Talk

    Model Coordination Strategies for Large-Scale Water Treatment Plant Projects

    Autodesk Construction Cloud, Revit, and Autodesk Forma: The Path to Collaborative and Sustainable Construction
    Instructional Demo

    Autodesk Construction Cloud, Revit, and Autodesk Forma: The Path to Collaborative and Sustainable Construction

    Digital Transformation from Traditional Design Deliverables and Coordination to Cloud-Based Design Collaboration
    Industry Talk

    Digital Transformation from Traditional Design Deliverables and Coordination to Cloud-Based Design Collaboration

    To Autodesk Construction Cloud and Beyond: 100 Projects, 500 Million Square Meters, and 1,200 Stakeholders
    Industry Talk

    To Autodesk Construction Cloud and Beyond: 100 Projects, 500 Million Square Meters, and 1,200 Stakeholders

    Streamlining Clash Detection: Using Navisworks Integration with ACC Model Coordination
    Hands-on Lab

    Streamlining Clash Detection: Using Navisworks Integration with ACC Model Coordination

    Model Coordination: How Design Teams Have Moved Beyond the Light Table at PDX Airport
    Industry Talk

    Model Coordination: How Design Teams Have Moved Beyond the Light Table at PDX Airport

    Related theater talks