Descripción
In this session, we will share the benefits of collaborative construction techniques between client, constructor, and modular provider utilising BIM 360 from design team to the factory and then to site. It's a reflection on the Hill Group digital construction journey.
Aprendizajes clave
Orador
- MBMike BeckettMike Beckett is the managing director of Hill Bespoke Ltd, a subsidiary of Hill Partnerships. Prior to this role, he was responsible for developing Hill?s Group strategy for BIM, not only to be Level 2 compliant, but to exploit the very real productivity gains when compared to the more traditional methods of designing, procuring, and constructing projects. He has over 30 years? experience in the Construction industry with the last 20 in housing.
Video Player is loading.
No transcript
Downloads
Etiquetas
Producto | |
Sectores | |
Temas |
A la gente que le gusta esta clase también gusta

Industry Talk